Buy, renovate, sell. Finance that covers the purchase and the works, drawn as the project progresses, repaid when the property sells.
Refurbishment to sell is the most common first development project, and for good reason: the exit is straightforward, the timescale is short, and the profit is created by the works rather than by market movement. It is also where the biggest under-estimates happen — on build cost, on time, and on what the finished property is actually worth.
| Type | Typical works | Typical term |
|---|---|---|
| Light | Kitchen, bathrooms, decoration, flooring, garden | 3–6 months |
| Medium | Rewire, replumb, new roof, windows, damp works, layout changes | 6–9 months |
| Heavy | Structural works, extensions, loft and basement conversions, back-to-brick | 9–18 months |
The line between refurbishment and development is structural. Once you are adding significant floor area or new structure, expect development finance criteria and rates rather than refurbishment ones.
A refurbishment appraisal is only credible if the finished value is evidenced. We look for three local comparables sold within the last six months, adjusted for condition and specification. Where those comparables do not exist, the exit is a hope rather than a value.
The second discipline is the works budget. A contingency of 10–15% is not padding, it is standard practice, and lenders expect to see it. Projects that run out of budget halfway through are the ones that become forced sales.
Every refurbishment we take on is tested against two thresholds: a maximum of 75% loan to gross development value, and a minimum of 20% profit on GDV after all costs, including purchase costs, works, professional fees, finance and selling costs. If the numbers only work with a lower standard, we will tell you rather than submit it.
Heavy refurbishment, structural works and conversions are development finance in all but name. We will place the deal with the right lender for the actual scope of works, not the label.
Not usually. Expect to fund 15-25% of total costs, though some lenders will advance up to 100% of the works if the purchase equity is strong enough.
They are closely related and often the same facility. A pure bridge funds the purchase; refurbishment finance also funds the works in stages. Heavier projects move onto development finance criteria.
In stages, against a costed schedule of works, usually certified by the lender-appointed monitoring surveyor. You fund each stage and are reimbursed, or draw in arrears.
Most facilities allow an extension for a fee. You should also plan a refinance or rental exit as a fallback, and lenders will ask for that plan at application.
Yes, and it can be more tax-efficient. The finance is structured the same way, but the exit becomes a refinance onto a buy-to-let or HMO mortgage once the works are complete and the property is let.
Send us the property, the works schedule and the finished value evidence, and we will come back with a structure.