Wednesday's Budget put first-time buyers back at the centre of the new-build market. For developers with multi-unit schemes over £2.5m, here is a lender we can access that funds the gap between practical completion and sold-out — at 0.65% per month, up to 75% LTV.
Wednesday's Budget introduced the Your First Home equity loan scheme: buyers taking a new-build as their first home can put down as little as 2.5% and receive a government equity loan of 20% of the purchase price, interest-free for five years. There are price caps (£650,000 in inner London, £500,000 elsewhere), income caps of £110,000 for a single buyer and £140,000 for a couple, and roughly 70,000 buyers are expected to use it.
For developers, the message is straightforward: the demand for entry-level, first-time-buyer-priced new-builds just acquired a government subsidy behind it. But demand and cash are not the same thing.
Sales on these schemes complete more slowly than the sales board suggests. The buyer is usually a first-timer with a 95% loan-to-value mortgage, an equity loan application running alongside it, and no chain to break but every reason to need a few extra weeks. Multiply that across a 12 or 24-unit scheme and a developer who has spent two years and their entire facility can find themselves at practical completion with five or eight units unsold, the development facility at its limit, and the clock running on interest.
That is precisely the gap a developer exit bridge fills — and it is why this product has become far more relevant in the last week than it was a fortnight ago.
Developer exit bridging repays the development facility at practical completion and carries the unsold or part-sold element of the scheme until sales complete, or until the units are refinanced into a buy-to-let portfolio. It is not construction finance. The build is finished; what is being funded is the time between a finished unit and a completed sale.
That combination is unusual. Most exit bridges price above 0.75% per month, and most lenders cap scheme size by total facility rather than opening the door to larger multi-unit sites. A £2.5m-plus floor means this is aimed squarely at developers running serious schemes rather than one-off conversions.
Take a realistic example. A 12-unit scheme with a £4.8m gross development value reaches practical completion with five units unsold at £400,000 each. The developer needs £1.5m — 75% of the remaining £2.0m of stock — to clear the development facility and hold the units while sales complete.
| Item | Figure |
|---|---|
| Bridge amount | £1,500,000 |
| Monthly rate | 0.65% |
| Monthly interest | £9,750 |
| Interest over six months (rolled up) | £58,500 |
| Arrangement fee (illustrative 1%) | £15,000 |
| Legal and valuation (illustrative) | £4,300 |
| Total cost of holding six months | ≈ £77,800 |
Set that against the alternative. If the development facility is priced at 0.90% per month plus a non-utilisation fee, extending it instead can cost more than the exit bridge — and some development lenders simply will not extend past practical completion. The bridge also does something an extension cannot: it separates the completed stock from the construction facility, which is exactly what a refinance lender wants to see when the units go to buy-to-let.
On a bigger bridge the numbers scale predictably: £2.6m at 0.65% is £16,900 a month, £101,400 over six months before fees.
The bridge is drawn at or shortly after practical completion and redeems the development facility. Because the security is completed, sellable residential units rather than a building site, the lender is underwriting sales values and absorption, not build risk.
Each completion releases the relevant unit from the charge and repays the corresponding slice of the bridge, usually with a minimum redemption per unit. This is the part that matters on a multi-unit scheme: you are not servicing the whole loan until the last unit sells.
Interest is typically rolled and settled from sale proceeds rather than paid monthly, which preserves cash during the sales period. That is a meaningful difference on a scheme where every pound is committed.
Two routes: individual unit sales to first-time buyers, or a bulk refinance into buy-to-let if the sales market softens and the rental yield stacks up. Lenders on this product generally want to see at least one credible exit evidenced, and often accept a blended one.
The lender's appetite is deliberately narrow: homes intended to meet first-time-buyer criteria. In practice that means units priced within the Your First Home caps and configured for the entry market — one and two-bedroom apartments, starter houses, sensible service charges, and a specification that keeps the total cost of ownership low.
That narrowness is not a restriction to work around; it is the reason the rate exists. First-time-buyer stock has the deepest buyer pool in the country right now, supported by a government equity loan, and a lender underwriting the exit on that stock is underwriting the most liquid segment of the residential market.
Every product has a shape it fits and shapes it does not. This one is case-by-case, which means an indication is not an offer, and no broker can promise an outcome before the lender has seen the scheme.
The real risk on exit bridging is not the rate — it is overrunning. Six months at 0.65% is comfortable. Twelve months on a slow-selling scheme eats margin quickly, and if the market stalls you are paying to hold stock you did not plan to hold. Model the downside absorption, not the brochure absorption.
Second: confirm your unit pricing genuinely sits inside the first-time-buyer scheme caps for your region. A scheme that drifts above the caps loses the equity loan support that makes the buyer's 95% mortgage work, and the exit slows.
Third: at 75% LTV against completed stock, the equity you leave in the scheme is your buffer. On a scheme with thin margins, check the buffer survives a 5% value adjustment before you commit to the bridge.
This is an exit product, so it works best as a planned second phase rather than a rescue. If you are currently funding a multi-unit scheme over £2.5m with first-time-buyer stock, the right time to structure the exit is now, while the build is still running, so the redemption and the bridge line up cleanly at practical completion.
If the scheme is already complete and the development facility is stretched, it can still work — but the lender will want to understand why the facility was not extended, and the answer needs to be commercial, not administrative.
Send me the unit schedule, the GDV and the redemption figure. I will tell you within 24 hours whether it fits this lender's appetite — and if it does not, which of the other exit options does.